Laserfiche WebLink
NEW MINE <br />Minor: <br />-Original exploration roads and 2.75 ac. <br />drillsites (backfilled, graded <br />and reseeded). <br />- Fortner gypsum fines storage area at 1.84 ac. <br />mine entrance (fines removed, area <br />topsoiled and reseeded). Former <br />stockpile area at mine entrance <br />(topsoiled and reseeded). <br />- Sections of former pioneer haulroad .78 ac <br />to active mine area (backfilled, topsoiled <br />and reseeded) <br />Depleted slope in active mine area 3.20 ac <br />(topsoiled and reseeded). Reclaimed <br />slopes at waste rock area. <br />- Reclaimed benches of pit wall 1.00 ac. 9.57 ac. <br />Moderate: <br />- Previous mine entrance. Backfill in .69 ac. <br />Progress. <br />- Haulroad to active mining area. 4.11 ac. <br />- Topsoil storage and staging areas. 3.80 ac. <br />- Stockpile and processing area. 5.70 ac. 14.30 ac. <br />Major: <br />- Area of active mining in 1993. 15.15 ac. <br />- Waste rock area. 4.59 ac. 19.74 ac. <br />Total Affected Area as of 12-95 ------------------------ 43.61 ac. <br />Total Affected Area as of 12-94 ------------------------ 36.77 ac. <br />Additional Affected Area In 1995 Operation ------- 6.84 ac. <br />-2- <br />