SURVEY I6
<br />POINT 03/90
<br />B1
<br />82
<br />B3
<br />84
<br />B5
<br />86
<br />B7
<br />N 404,210.48
<br />E 1,448,735.10
<br />EL 6,150.22
<br />N 404,251.00
<br />E 1,448,643.87
<br />EL 6,147.61
<br />N 404,288.10
<br />E 1,448,550.60
<br />EL 6,146.54
<br />N 404,320.95
<br />E 1,448,456.60
<br />EL 6,144.99
<br />N 404,350.70
<br />E 1,448,361.09
<br />EL 6,144.98
<br />N 404,376.65
<br />E 1,448,264.96
<br />EL 6,143.31
<br />N 404,399.46
<br />E 1,448,167.58
<br />EL 6,141.46
<br />B8
<br />69
<br />B 10
<br />B 11
<br />N 404,417.24
<br />E 1,488,069.23
<br />EL 6,138.05
<br />N 404,433.66
<br />E 1,447,971.01
<br />EL 6,131.78
<br />N 404,449.42
<br />E 1,447,874.19
<br />EL 6,125.30
<br />N 404,465.58
<br />E 1,447,775.77
<br />EL 6,118.16
<br />LOWER REFUSE PILE - MONffORING SURVEYS
<br />SURVEY I7 SURVEYIB SURVEY I9
<br />05/90
<br />404,210.45
<br />1,448, 735.15
<br />6,150.07
<br />404,250.99
<br />1,448,643.88
<br />6,147.46
<br />404,288.08
<br />1,448,550.63
<br />6,146.40
<br />404,320.94
<br />1,448,456,62
<br />6,144.87
<br />404,350.67
<br />1,448,361.05
<br />6,144.83
<br />404,376.62
<br />1,448,264.92
<br />6,143.18
<br />404,399.38
<br />1,448,167.57
<br />6,141.32
<br />404,417.15
<br />1,488,069.18
<br />6,137.92
<br />404,433.60
<br />1,447,970.99
<br />6,131.60
<br />404,449.39
<br />1,447, 874.14
<br />6,125.14
<br />404,465.64
<br />1,447, 775.68
<br />6,118.00
<br />07/90
<br />404,210.48
<br />1,448,735.08
<br />6,150.09
<br />404,251.00
<br />1,448,643.83
<br />6,147.46
<br />404,288.15
<br />1,448,550.58
<br />6,146.37
<br />404,321.00
<br />1,448,456.55
<br />6,144.85
<br />404,350.72
<br />1,448,361.06
<br />6,144.83
<br />404,376.69
<br />1,448,264.97
<br />6,143.15
<br />404,399.40
<br />1,448,167.55
<br />6,141.29
<br />404,417.23
<br />1,488,069.19
<br />6,137.88
<br />404,433.66
<br />1,447, 971.00
<br />6,131.60
<br />404,449.43
<br />1,447, 874.21
<br />6,125.13
<br />404,465.61
<br />1,447, 775.80
<br />6,117.97
<br />SUAVEY 20
<br />7
<br />
|