Laserfiche WebLink
Lambert atla ~,~,~ociate,s' <br />CONSULTING GEOTECH NIC AL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT <br />PROJECT NUMBER M90016MT DATE 9_27-90 Thursday <br />PROJECT NAME West Elk Coal Company <br />PROJECT LOCATION Somerset, CO <br />TECHNICIAN J. Solum <br />WEATHER CONDITIONScool, Sunny <br />CLIENT West Elk Coal WORK REQUESTED density tests <br />CONTRACTOR FOREMAN <br />Ms. Kathy Welt <br />WORK PERFORMED BY LAMBERT AND ASSOCIATES REPRESENTATIVE (AND REMARKS) <br />I arrived at the project site at 4:45p,m. as requested <br />by Ms, Kathy welt. I performed soil moisture content <br />and soil density tests as requested by Ms. Welt of <br />material being placed in the coal gob pile using nuclear <br />soil density test methods. Please refer to the test <br />results sheet for approximate test locations and test <br />results. The test results indicate only the relative <br />compaction and soil moisture content of the material <br />tested at the elevation and location tested at the time <br />of our site visit. <br />P.O. BOX 3966 P.O. BOX 0045 463 TURNER, 104 A <br />GRAND JUNCTION, CO 61502 MONTROSE. CO B 1402 DURANGO, CO 61301 <br />(303) 2456506 (303) 249~215d (303) 2595095 <br />