Laserfiche WebLink
lambert anD ~,~,soriates <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT <br />I~ROJECT NUMBER [d90016MT DATE 7/24/90 Tuesda;i <br />PROJECT NAME West Elk Coal <br />PROJECT LOCATION Sommerset, CO <br />CLIENT West Elk Coal Mine <br />CONTRACTOR West Elk CoalMine <br />TECHNICIAN A. Woods <br />WEATHER CONDITIONS Cloudy <br />WORK REQUESTED Density Tests <br />FOREMAN Mr. Mike Price <br />WORK PERFORMED HY LAMBERT AND ASSOCIATES REPRESENTATIVE (AND REMARKS) <br />I arrived at the project site at 3:00 PM as requested by <br />Mr. Mike Price. I performed soil moisture content and soil <br />density tests as requested by Mr. Price of material being placed <br />on gob pile using nuclear soil density test methods. Please <br />refer to the test results sheet for approximate test locations <br />and test results. The test locations were determined by Mr. <br />Mike Price of West Elk Coal. Tate test results indicate only <br />the relative compaction and soil moisture content of the <br />material tested at the elevation and location tested at the <br />time of our site visit. I also obtained material for a Proctor. <br />R <br />P O BO%39% P O. BO%OWS •63 TURNER. t W A <br />GRAND JUNCTION. CO B t 502 MONTAOSE. CO B t 402 DURANGO. CO B t 30t <br />f30312a5~6506 13031 2a9~ 2 t Sa 130312595095 <br />