My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP18974
DRMS
>
Back File Migration
>
Report
>
REP18974
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:47:45 PM
Creation date
11/27/2007 2:32:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981004
IBM Index Class Name
Report
Doc Date
2/2/1998
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 110C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE/REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~ ~~~~I~~~~~~~~ ~~~ <br />Notice of Intent to Continue Mining Operations <br />110c Construction Materials Annual Report <br />Permittee Name: Dilleys Sand & Gravel <br />Permit No. M-81-004 <br />Operation Name: Ayers Pit <br />Anniversary Date: February 02, 1998 <br />Total: $225.00 (Due on your Anniversary Date) <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />9. <br />10 <br />11 <br />Ke<: 13 y8 <br />~k~ 3y !3 <br />RECEII/ED <br />~~~ oz ~sse <br />Division of Minerals & Geology <br />a. Permitted acreage: 7. '7 b. County where mine is located: <br />Has this mine been granted TEMPORARY CESSATION STATUS? <br />Does this mine operate MORE or LESS than 180 days per year? <br />Does this mine have a phased reclamation plan? <br />Total acres affected during the report year:* irp.7 Gi <br />Total acres reclaimed for the report year:* <br />Total number of acres in topsoil replacement stage: <br />a. Average thickness of topsoil replaced: <br />//~~~ dx/ <br />YES l__% <br />MORE LESS <br />YES NO <br />/~ry-l3-ic-L <br />/[AM l_ <br />~7~ <br />Total number of acres seeded: /(9-~c.<. <br />a. List species seeded & seeding rate for report year on back <br />For non-phased operations provide dates extraction ceased: <br />a. Date reclamation began: <br />The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* /2B'~'~-L <br />Estimated to't/a~l acres to be affected in the next report year: * liirr. '~iX.~Iw <br />COMMENTS: ~/Kc4~ 17 l ~~.4 zfJZ A.t~~ ~i.0 iD ~ ~8~F.3 Ll~eJ °u~t- <br />~ __ <br />* Please show the location of the acreage for items 4 - 6 on your map**. Indicate <br />the phases of the reclamation which have been completed, correlated with your timetable. <br />For phased operations show dates extraction ceased and dates reclamation began. <br />** NOTE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 through <br />6, then a new mfLa//Jp is unnecessary. However, this must be stated above. <br />Signature: ,iC-L!t1-! r./ ~.~Jpl~. Date: ~' a ~I - rI S <br />Please type or print current contact name, mailing address, and phone number below: <br />Contact Name: COLCIEN JIi~~E~ <br />Company: ~/ %~E~1~S Sf~/1/l~cE ~iP/fU~L <br />Address: ~~/S/ ~O/Yf ii i/.~CJ.S S~ <br />/1~ U -S /L. ~d~e SO 71 `5 <br />'~ <br />Phone: { 970 ) "fit . 2 A/D <br />FAX NO: ( ~/7G) ~YZ- 2~~% <br />Federal Tax ID No. or Social Security No.: ~Y - D SG O SSA <br />
The URL can be used to link to this page
Your browser does not support the video tag.