Laserfiche WebLink
iii iiiiiiiiiiiii iii <br />,. <br />RECEV\~ED <br />DEC 1 5 1997 <br />Deczrnber 12, 1997 <br />Division of Mmerais a ueo'~ogy <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, Inc. - San Luis Project <br />Df4G Permit No. M-88-112, TR-010 <br />Weekly Pond Compliance Report <br />December 07-//1ID~(eY~c\ember 013, 1997 <br />Dear Mr. Dillie: Vf:/\1. <br />,attached is a summary of the cyanide analysis performed on samples from <br />the tailings pond and the collection pond during the week of December <br />07- December 13, 1997 as required by the approved TR-010. <br />During the week, the tailings pond averaged 0.120 ppm CN-wad and 0.313 <br />ppm CN-total. The collection pond averaged 0.038 ppm CN-wad and 0.0=~5 <br />ppm CN-total. <br />Sincerely, <br />~~ "/ <br />Ron Zu alt <br />cc: Bill Lyle <br />Dan Robertson <br />