Laserfiche WebLink
<br />III IIIIIIIIIIIII III __ <br />~ 00 °~ 1MI9 ~ `~01~ I~ <br />(719) 275-4275 • 1360 Rudd Avenue • Canon City, CU 81212 <br />March 11, 1999 <br />`~c~ <br />~~ <br />Mr. James Stevens <br />Division of Minerals and Geology <br />1313 Sherman Street Suite 215 ~%;_ <br />Denver, Colorado 80203-2273 ~CF/~/~D <br />Dear Mr. stevens: M~k 15 X999 <br />`~`'' d ~eo1~y <br />Re: Annual Report, Annual Date 3/16/99 <br />Bedrock Mine ,#1, MLR No. M-97-086, <br />FEDERAL TAS ID1(t 84-1432544 <br />~ ~~~, <br />The current bond amount is $21,400, the permitted area is <br />329.69 acres ± and the pit has two mining phases. This pit HAS NOT <br />been granted a Temporary Cessation and it HAS operated more than <br />180 days this year. Mining has taken place in the southern 160 <br />acres covered by current county regulations. There has been no <br />mining within 200 feet of the Peck Creek tributary canyon as <br />required. The Annual Report map is an excerpt from the application <br />maps showing the Southeast portion of the mine. <br />We will deal specifically with each of the Annual Report <br />questions as required in Rule 1.15 of the Rules and Regulations and <br />the Annual Notice Letter. <br />(1) We began mining on 6 field stone areas this year disturbing <br />less than 5.0 acres as allowed in the permit. We also started <br />mining a slab stone area covering approximately 0.51 acres <br />near the Pinon Mine in Stage 1. We also, removed materials <br />stockpiled in past years that are located within the Stone <br />Yard area and surrounding the Siloam Mine. Field stone mining <br />is allowed in both stages simultaneously but reclamation is to <br />follow immediately. The following table shows the status of <br />the area, in acres, disturbed at the mine: <br />(2) <br />DISTURBANCE':.:' :.: ' :: ::::.:::.:::. ::.'::STAGE:1.:;; ::: :.;STAGE 2:.': ::TOTALS::: <br />Field stone reclaimed (green) 1.60 0.00 1.60 <br />Slab stone mining (blue) 0.51 0.00 0.51 <br />Active field stone mining (red) 0.00 0.29 0.29 <br />Topsoil stockpiles (tan) 0.41 0.00 0.41 <br />Stone Storage (purple) 2.52 0.29 2.81 <br />No reclamation was required this year in the slab stone mining <br />area. As required in the permit, we have seeded the field <br />