Laserfiche WebLink
<br />SURFACE WATER MONITORING RESULTS <br />Table 1 in Appendix A, shows the approved Surface Water monitoring program for the New <br />Horizon Mine. This includes 7 NPDES discharge points. <br />Surface Water Monitoring <br />Appendix B and C document the 1996 water year monitoring data including flow rates and <br />lab analysis. 'the data is shown both in table and graph form. Normal' fluctuations in water <br />levels were concurrent with irrigation season and spring runoff. <br />All required water quality monitoring results are in table form in Appendix B and C. <br />Generally, quality parameters at all groundwater monitoring wells were within historic <br />ranges. No significant abnormalities were noted during 1996. <br />NPDES Discharge Monitoring <br />Appendix D contains the flow and water quality data for seven NPDES discharge points. At <br />• New Horizon 1, only NPDES 001 discharged while 002, 003, 004, 005, and 006 just <br />collected surface runoff. NPDES 007 (SW-N102) at New Horizon 2 Mine discharged during <br />the period. All effluent was sampled as required with the results show. All Npdes <br />discharges were within parameter limitations for water quality and quantity. <br />Whole Toxicity Testing (WET) <br />As required under the current NPDES permit, Whole Toxicity testing of water discharged <br />from Pond 001 on an annual basis and Pond 007 on a quarterly basis. The results are shown <br />in Appendix D. All test during this period passed with greater then 100% survival rate. <br />lJ <br />3 <br />