Laserfiche WebLink
,. ~ L <br />Sandra Emrich -2- June I5, 1982 <br />In light of these observations by the operator's consultant, CTL/ThompSOn, Inc., <br />I recommend that we require Empire Energy Corporation to •:omplete amendment <br />of their surface drainage plans for the processing coal waste bank and the <br />supporting design narratives within ?0 days. In my opinion, the topics <br />discussed in (2) and (3) above are required by the performance standards of~ <br />Rule 4.10. I suggest that you ca.11 the operator's attention to these specific <br />points, which are required by regulation. <br />/mt <br />cc: Dave Shelton <br />Ed Bischoff <br /> <br />