Laserfiche WebLink
SNOWCAP COAL COMPANY <br />Cameo Refuse Disposal Area No. 2 Inspection - 1 sc Quarter 2005 <br />On March 10, 2005, I performed the required quarterly visual inspection of the Cameo <br />Refuse Disposal Area No. 2 in accordance with Rule 4.10.2. <br />I, J. E. Stover, P.E., have a wide variety of experience in the design and construction of <br />earth fill embankments. Nothing was observed during the inspection that would indicate <br />the pile has a potential for failure. The pile was dry. No seepage was noted around the <br />pile. The upper diversion ditch was inspected with no problems noted. The pile has <br />been covered with the required 24 inches of non-toxic material. <br />The pile is located in a remote area well away from human habitation. A failure of the <br />pile might damage the haul road and sediment pond located below the pile. However,. <br />a failure of the pile would probably not be a hazard to human life. <br />I certify that to the best of my knowledge and belief, that the fill and other aspects of the <br />Cameo No. 2 refuse pile have been constructed as permitted in the design approved by <br />the DMG. <br />' Bd®~®O <br />®8~~5 ~Ev S3`~0 <br />Recommended maintenance: None oe~P~'°e~°°l°,~,; 3 <br />o ~o0 4s T,,':, :fie <br />•o.~~>. I <br />James ~ Stover ' :' ~-~ Date <br />Ae .,zda <br />P.E. f~p~9~30 eo `+` ~e <br />ee~eae°~ ~1 6 <br />eo'os®~(7~~~®ed9A <br />