Laserfiche WebLink
Table 1.2-2 <br />• Hydrology Monitoring Requirements -New Elk Mine' <br />Field Measurements NPDES Biomonitorinst <br />Flow RateANater Level Depth Frequency and parameters in <br />pH (S.U.) accordance with NPDES Permit <br />Conductivity (umhos) <br />Temperature Sediment Pond NPDES List <br /> Frequency and parameters in <br />Short List accordance with NPDES Permit <br />Sodium Adsorption Ratio (SAR) <br />Total Suspended Solids (TSS)(mgA)2 Sewage Treatment <br />Total Dissolved Solids (TDS) (mgA) Frequency and parameters in <br />Carbonate (mg/l) accordance with NPDES Permit <br />Bicarbonate (mgA) <br />Chloride (mg/I) NE-080 (PRS-0) <br />Sulfate (mgll) Frequency and parameters in <br />Manganese (Mn) (mgA) total, dissolved accordance with NPDES Permit <br />Potassium (K)(mgA) <br />Sodium (Na)(mg/I) <br />Iron (Fe)(mg/I) total, dissolved, total recoverable2 <br />Fluoride (F)(mgA) <br />Hardness (calculated) <br />• <br />' From Table 28, New Elk Permit C-81-012 <br />z Surface. Water Ony <br />