My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP18460
DRMS
>
Back File Migration
>
Report
>
REP18460
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:47:19 PM
Creation date
11/27/2007 2:24:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991073
IBM Index Class Name
Report
Doc Date
6/2/1997
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 110C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• III IIIIIIIIIIIIIIII • <br />RECEIVE <br />Notice of Intent to Continue Mining Operations <br />110c Construction Materials Annual Report JUN 0 2 1,491 <br />Permitteda Name: Kiowa County <br />Permit No. M-91-073 DiviSionotMinerdl5~ _ <br />Operati ors Name: Ferris Pit" - •„~ <br />Anniver sz~ry Date: July 12, 1997 <br />Total: $225.00 (Due on your Anniversary Date) Ly~~~A E <br />1. a. Permitted acreage: ~ County where mine is located: ~~f/1 <br />2. Haa this mine been granted TEMPORARY CESSATION STATUS? YES NO <br />Do~>s this mine operate MORE or LESS than 180 days per year? MORE LESS <br />3. Doi=_s this mine have a phased reclamation plan? y S- NO <br />9. To .al acres affected during the report year?* l -•Z <br />5. To~.al acres reclaimed for the report year:* ~ <br />E. To~_al rumbler of a^_res in topsoil rep'_acement stage: /^Z. <br />a. Average thickness of topsoil replaced: ~~ 4 ~~ <br />7. Total number of acres seeded: <br />a. List species seeded & seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: ~ ~u <br />a. Date reclamation began: ~U <br />9. ThE~~type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* /7/,/~ <br />10. Estimated total acres to be affected in the next report year:* (-~, <br />11. coru~ENTS: }l.~vE /747` .S~AA~-~,2 v`E~/~G O~ XE~i~/>~n~ ~Fr~,Dadj~•j <br />~I ~Ip~s <br />* Plea se show the location of the acreage for items 4 - 6 on your map**. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. For phased operations show dates extraction ceased and dates <br />reclamation began. <br />** NOTE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, this must be stated above. <br />Signature: /{GI,/~,.b~~/~ Date <br />Please type or prinE current contact name, mailing address, and phone number below: <br />KIOWA COUNTY COAiMISSIONERS phone: (n1 G~') ~ ~~ .~~~0 <br />Contact Name: <br />Eeds, Colorado 81036 FAX NO: ( ) <br />Company: <br />Address: <br />Federal T.ax ID No. or Social Security No.: ~ 7~~~ Q Q ~ 7.S <br />
The URL can be used to link to this page
Your browser does not support the video tag.