Laserfiche WebLink
' MINE INFLOW STUDY <br />A'3 MINE <br />SNOWMASS COAL COMPANY <br />11/22/83 <br />6/27/84 <br />AREA SOURCE FLOW <br />(GPM) TEMP <br />(°C) COND <br />(UMHOS) pH <br />(SU <br />1 Roof Bolt Holes .25 7.5 1050 7.6 <br />2 Roof (Fault (.1 5.8 1160 7.7 <br />3 Roof Bolt Holes .25 8.9 1160 7.9 <br />4 Coal Floor Interface <.O1 - - - <br />5 Roof Fall .5 6.5 1560 7.7 <br />6 Roof Bolt Holes .l 6.2 1260 7.5 <br />7 Fault -Roof Bolt Holes 5.0 7.0 1510 7.0 <br />8 Roof Bolt Holes 35.0 11.0 1630 6.7 <br />Total Mine Inflow = 93.6 GPM <br />Total M9ne Discharge = 110 GPM <br />Total Consumption = 0 GPM <br />FLOW TEMP COND pH <br />(GPM) (°C) (UMHOS) (5U) <br /> <br />1.0 12.0 1280 8.1 ' <br />< .10 11.5 1350 7.8 <br />1.5 13.2 1440 7.9 <br /> DRIED UP <br />1.0 9.4 1355 7.8 <br />5.0 13.0 1175 7.6 <br />35.0 13.2 1350 7.3 <br />50.0 13.6 740 7.2 <br />