a <br />Parrnittee: WHI~ATER BUILDING MATERIALS CORP • PAGE 2 <br />Permit *: M-77-729 <br />Operation Name: WHITEWATER 500 PIT <br />Anniversary Date: 09/22/97 <br />We will deal specifically with each of the Annual Report <br />requirements as outlined in Rule 1.15 of the Rules and Regula- <br />tions, and in the annual notice letter. <br />(1) Mining continued in Stages 2, & D as approved, on the areas <br />previously stripped. Mining disturbed 7.8Q acres t in Stage <br />2; and 2.08 ac. ± in Stage as shown on the Annual Report Map <br />(green). The Plant Site in Stages w, Z and 2 is still in <br />use (lite yellow). we have 9.62 acres in Stage 2 and 1.82 <br />in Stage D stripped ready for mining (purple). The power- <br />line in the east central part of Stage 2 was removed this <br />year (red line). This means we will initialize Option 1 of <br />the approved mining plan. To refresh your memory, option 1 <br />allowed us to create a single lake in Stage 2 and to mine <br />the gravel from under the powerlines instead of having two <br />lakes separated by a narrow dike. <br />(2) Most of the reclamation is complete in Stage 1 at this time. <br />We have monitored the planting done last year. Please refer <br />to Map (kl from the 1996 annual report for those areas. We <br />planted 30 seedling Sumac trees on May 9, 1997, in the <br />southwest corner of Stage 1. Approximately 508 have sur- <br />vived to date. We are preparing to create the slopes along <br />the west and south sides of the lake in Stage 2. The mate- <br />rial needed to do this is stockpiled in the areas shown on <br />the map (blue). <br />All the revegetation areas in Stages X, Y and 1 are resoiled <br />ready for seeding. We have been monitoring the slopes in <br />this area. These areas are beginning to show vegetation <br />growth consistent with the surrounding area. we have 800 <br />YD3 of topsoil stored in Stage 1 and 4,500 YD3 in Stage 2 <br />(orange). <br />(3) We will mine on 9.62 acres ± in Stage 2 this year (purple) <br />and on the 1.82 acres t stripped in Stage D (purple). If <br />more area is needed we will resume stripping towards the <br />east side of Stage 2 and move into Stage E. <br />(4) The amendment submitted in 1981 explained that until we stop <br />dewatering Stage 1 the chances of establishing vegetation in <br />Stages X, Y and the banks of Stage 1, are very slim because <br />of the very arid conditions in this area. we have found <br />that this was true. Now that the lake has been stable for a <br />year natural invasion of grasses and shrubs have begun to <br />occur. Bank sloping and grading will continue once mining <br />is completed on the shore line in Stage 2, that will not be <br />disturbed in the future. <br />