My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-02-15_REPORT - M1988042
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1988042
>
2007-02-15_REPORT - M1988042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:35:37 AM
Creation date
11/27/2007 2:23:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988042
IBM Index Class Name
Report
Doc Date
2/15/2007
Doc Name
Annual Fee/Report/Map
From
Lafarge West, Inc.
To
DRMS
Permit Index Doc Type
Annual Fee / Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
otice of Intent to Continue Mining Operations ~E~VEr <br />112c Construction Materials Annual Report <br />~-.B 152~~~/ <br />Pe rmittee Name: Lafarge tn'e st, Inc. _.,,,ion of Re~,,,..._,.,,.,, <br />Permit No: M-1988-042 <br />Mining and ~arfety <br />Operation Name: Cottonwood Pit r <br />Anniversary Date: February 15, 2006 <br />Total: $688.00 (Due cn your Anniversary Date) <br />1. a. Permitted acreage: 400.3 b. County where mine is located: Weld <br />2. Fas this min e been gr anted TEMPORARY CESSATION STATUS? NO <br /> Does rn~.s mi ne operat e MORE or LESS than 180 days per year? More <br />3. Does phis mi ne have a phased reclamation plan? Yes <br />9. Total acres affected during the report year:* +/_54 <br />5. Tota_ acres reclaimed for the report year:* +/-34 <br />6. mota_ number of acres in topsoil replacement stage: p <br /> a. Average thickness of topsoil replaced NA <br />7. Total number of acres seeded: 0 <br />a. List species seeded and seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: NA <br />a. Date reclamation began: NA <br />9. The type and approximate quantity of fertilizers, organic material or soil <br />condid one rs used for the report yeah * None <br />10. Estimated total acres to be affected in the next report year:' +/-139 <br />11. COMMENTS: On-gOlnq fn In lnq end reClefTl allOn aC(IVliles <br />* Please show the location of the acreage for items 9-6 on your map**. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. For phased operations show dates extraction ceased and dates <br />reclamation began. <br />*` NOTE If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through v', then a new map is unnecessary. No~.ie ver, this must be stated above. <br />Signature: ~f(,((`~ ~~fl1J.zLd U_I-~ Date 2/13/2007 <br />Please type or print current contact name, mailing address, and phone number below: <br />contact Name: Eric Reckentlne Phone: 303-657-'-~~ <br />FAX No: 303-657-`~d~l <br />Company: Lafarge West, Inc. <br />Address: ~ p ~ Q~~ jA)/1~1 `~~b <br />-~~IV1lfl~tCC~ ~,©~~- <br />Federal Taa ID No. or Social Security No.: <br />
The URL can be used to link to this page
Your browser does not support the video tag.