My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP18331
DRMS
>
Back File Migration
>
Report
>
REP18331
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:47:13 PM
Creation date
11/27/2007 2:22:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996060
IBM Index Class Name
Report
Doc Date
1/4/1999
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~- ~ <br />~e~: lo8d' <br />r.=,,~ ~. <br /> Notice of Intent to Continue Mining Operations <br />998 <br />~ <br />~ <br /> Q <br />112c Construction Materials Annual Report . R <br />N <br />Permit tee Name: Hall-Irwin Construction Co. <br />Permit No. M-96-060 ~IVISi0!10i wllliel2b ~ Vc.., •.. <br />Operat ion Name: Firestien Pit <br />Annive rsary Date: December 31, 1997 <br />Total: $550.00 (Due on your Anniversary Date) <br /> <br />1. <br />a. Permitted acreage: ~ b. County where mine is loca 1r~ )~~~ <br />ted: ~~ <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? YES NO <br /> Does this mine operate MORE or LESS than 180. days per year? 2E LESS <br />3. Does this mine have a phased reclamation plan? YES NO <br />4. Total acres affected during the report year:* fs <br />5. Total acres reclaimed for the report year:* ~-/ <br />6. Total number of acres in topsoil replacement stage: <br /> <br />a. Average thickness of topsoil replaced: ~r <br />/Z <br />7. Total number of acres seeded: <br /> a. List species seeded & seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: <br /> a. Date reclamation began: <br />9. The type and approximate quantity of fertilizers, organic mater ial or soil <br /> conditioners used for the report year:* A]owxo <br />10. Estimated tot <br />acres t <br />o be affected in the next <br />report <br />a l <br />year: <br />* Z <br />G <br />11. ~ <br />_ <br />~( <br />1l <br />l <br />1 <br />CONAtENTS: L h~~S '~t IS r~pl~.~„o Thn rIPf ~Ct ` <br />` <br />fJ~Y I~ <br />* Please show the location of the acreage for items 4 - 6 on your map*•. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. For phased operations show dates extraction ceased and dates <br />reclamation began. <br />** NOTS: If there have not been any changes since the last annual report and you <br />previously submitted a p which correctly depicts the current acreage in items 2 <br />through 6, the>p a new m~ is unnecessary. However, this must be stated above. <br />Signature: _~ ~R4 Date: IZ( 3(~Q7 <br /> <br />Please type print <br />r <br />t Contact name, mailing address, and phone numbe <br />r <br />b <br />elow: <br />Contact Name: ~~ <br />~ <br />~ L/jCpve Phone: ( / <br />- <br />~. <br />Q ~G ) ~S2-L7 <br />c4 7 <br /> FAX NO: ( / <br />QX'. ) ,352-Cp ZB~/ <br />Company: JJ II <br />"T ~~~ ' ~fW„~ fI f <br />~Ck.1-}t ut}~o ,.~ <br />Address: ~•d• ~ SIB' <br /> // <br />l~raa.~e~., ~O ~J~9~7 <br />Federal Tax ID No. or Social Security No.: ZS"I 'QSZ"1573 <br />~@ <br />
The URL can be used to link to this page
Your browser does not support the video tag.