My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP18324
DRMS
>
Back File Migration
>
Report
>
REP18324
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:47:12 PM
Creation date
11/27/2007 2:22:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Report
Doc Date
2/28/2002
Doc Name
2001 AHR & ARR Page 66 to Page 132
From
Coors Energy Company
To
DMG
Annual Report Year
2001
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• MASS BALANCE <br />Remaining B-Pit Airspace Volume <br />During the year 2001, CEC disposed of 43,076 tons of mixed fly and <br />bottom ash, obtained from the Trigen Colorado Energy Corporation facility <br />(see Ash Disposal Data), in the south end of B-Pit, using approximately <br />9,440 bank cubic yardst (BCY) of overburden material to cover the disposal <br />areas in accordance with local (Weld County) regulations for solid waste <br />disposal sites, specifically to control dust and fugitive debris in the <br />immediate areas of the pits. No mine waste rock was delivered to the <br />Keenesburg site for disposal during the year. Approximately 8,340 BCY of <br />overburden material was used in the reclamation of southern portions of B- <br />Pit. Approximately 6,858 BCY of topsand was moved from topsand piles <br />A-1 and B-1 as part of the reclamation work at the southeast corner of B-Pit. <br />1,538,070 BCY <br />(to proposed final reclamation contours) <br /> <br />Remaining A-Pit Airspace Volume <br />0 BCY <br />(to proposed final reclamation contours) <br />Long-term Spoil Remaining On Site <br />Topsand Stockpiled On Site <br />Stockpile A-1 138,800 BCY <br />Stockpile A-3 113,400 BCY <br />Stockpile B-1 129,150 BCY <br />523,280 BCYZ <br />381,350 BCY <br />' Denoted as "cubic yazds in place" <br />2 As indicated in the 2000 AHR Report, previously reported values appear [o have been a calculation <br />error carried forward in past Reports. In order to address the Long-Term Spoil Pile (LTSP) overburden <br />volume discrepancy, a technical revision to the facility permit will be completed. The technical revision <br />will address the required overburden volume necessary to complete periodic and fmal cover in B-Pit for the <br />remaining duration of reclamation aMivities (estimated to be approximately 450,000 bcy). To achieve the <br />requued overburden volumetric balance, the technical revision will propose raising the final reclamation <br />grade, or the approximate original contour (AOC), by approximately 1 [0 2 feet in the LTSP area. <br />AHR-2001 -126- <br />
The URL can be used to link to this page
Your browser does not support the video tag.