Laserfiche WebLink
100! HydroloRlc Repar( <br />Table 1.2-3 <br />Hydrology Monitoring Requirements <br />Golden Eagle Mine <br /> <br />Site Water <br />Level Field <br />Measurement* Short <br />List Annual <br />List* <br />Groundwater Sites: <br />PAW-5 Q Q S A <br />PAW-6 Q Q S A <br />CCAW-1 Q Q S A <br />LA-264 (Overburden) S <br />SF-2 (Overburden) S <br />NM-22 (Overburden) S <br />NM-20 (Overburden) S <br />NM-21 (Coal) S <br />GEM-1 (Mine workings) M S S A <br />GEM-2 {Mine workings) M S S A <br />GEM-3 (Mine workings) M S S A <br />may; M = Monthly <br />Q = Quarterly (February, May, August, November) <br />S = Semi-Annual (May and November) <br />A + Annually (November) <br />* =See Table 1.2-4 for pazameters included in each suite <br />IOOOAHReporl-RPT(297J/April l9, Z002 8 <br />