Laserfiche WebLink
2001 Hydrologic Report <br />Table 1.2-1 <br />Hydrology Monitoring Requirements <br />Golden Eagle Mine <br /> Water Level Field Short Annual NPDES <br />Site or Flow Measurement* List List* List* <br />Surface Sites: <br />PRS-2 Q Q Q A <br />PRS-3 (GE 080) Q Q Q A <br />CCS-I Q Q Q A <br />CCS-2 Q Q Q A <br />Groundwater Sites: <br />PAW-5 Q Q Q A <br />PAW-6 Q Q Q A <br />CCAW-1 Q Q Q A <br />LA-264 (Overburden) S <br />SF-2 (Overburden) S <br />NM-22 (Overburden) S <br />NM-20 (Overburden) S <br />NM-21 (Coal) S <br />GEM-1 (Mine) Q Q A <br />GEM-2 (Mine) Q Q A <br />GEM-3 (Mine) Q Q A <br />NPDES Stations: <br />GE 003 (Pond) W, M' <br />GE 004 (Pond) W, M' <br />GE 080 (PRS-3) W, M' <br />may; W Weekly A = Annually (November for all sites) <br />M = Monthly * = See Table 23 for parameters included <br />Q = Quarterly(February, May, August, in each suite. <br />November) ' = When discharging <br />S = Semi-Annual (May and <br />November) <br />1000ANRrparl-RPT(292J/April l9, 2001 6 <br />