Laserfiche WebLink
<br /> <br />Susan Mowry <br />April 30, 1985 <br />Page two <br />The subdrains shall be daylighted at the toe of the bench and collected in a <br />ditch to drain into Pond i/1. The leachate shall be collected at this point. A <br />full analysis of leachate quality shall be run two times per year. The leachate <br />quality analysis shall be submitted to the Division twice per year. <br />A map showing the proposed location of the piezometers and stability monuments is <br />included for your reference. <br />Sincerely, <br />~~`° <br />Larry M. Reschke, P.E. <br />Mine Engineer <br />LMR:JES:tgn <br />Attachment <br />cc: Jim Stover <br />