Laserfiche WebLink
02/01/2005 14:55 9709295595 WEST ELK <br />Feb 01 OS 06:59a Lambere antl psseelaLes 8702493262 <br />PAGE 10 <br />p.3 <br />~ttx>rr~~:I"t Mxt~r ~~,>Y>CTirt~PS <br />CONSULTING GEOTECNNICAL FNGINGERS AND MATERIAL Tr:&TING <br />DAILY It1L'LD RF.POR7' <br />PROIE('1' NUMBER: MUOp48MT DA'1'L: Friday, 1p-8-04 <br />PROJECT NAME: West Elk Mine, Gob Pile <br />PROJECT IACATION: Sumcroa, CO <br />Ci,IF.NT: West Elk Mine <br />CONTRACTOR: West Elk Minc <br />T[iC1INICIAN: Glendening <br />WBATHF,R CONDI'T'IONS: tiunny <br />WORK RE(ZUkSTLiD: DCnsiry tests <br />PORF.MAN: Rick 1oltnsvn <br />WORK PERPORML'D BY LAMBERT AND ASSOCIATES RFPRL+SL•NTATIVL~ (ANA Rfl.MARKS) <br />I amved at the proj ect site al I.1 S p.m., as requested by Henry Barba. i pcrlilrtned soil density tcvts, ss <br />requcvteci by Mr. Barbe, of malcrial being placed for the coat gob pile, eying nuclcat soil density tcvt <br />mcthodv. Please refer to the test results sheet for approximate test Iccation:t trod test tesulis. The teat <br />results vrc7C verbally given to Rieklohtlson, at rho time o!'our sift visit- The tC.vt azca was determined try <br />Rick Johnson. 7bc test results indicate only the relative compaction and soil muiyturc Content of rho <br />mstcrisl tested at the elevation and location tested at the time of our site visit. <br />P.O. Bmc 3418 P.O- Bes 0045 216 Bodo OrFro <br />Grand JwroGOn,C087602 Monttoa0. C08140Z D4rang0,C087901 <br />(97012aS8606 {9701 249.2154 (4701269.8098 <br />FA1C (97012x6.9768 FaJt; 1870) 219 9282 FA7t: (970) 38211515 <br />