Laserfiche WebLink
02/01!2005 14:55 9709295595 WEST ELK <br />~ttxrt~Z.er~ ~txC~i ~1.~~iQ>L`t~[~.e~ <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT <br />PROJECT NUMBER: M04048MT DATE: Tuesday, 8-17-04 <br />PROJECT NAME: West Elk Mine, Gob Pile <br />PROJECT LOCATION: Somerset, CO <br />CLIENT: West Elk Mine <br />TECHNICIAN: Glendening <br />PAGE 28 <br />WEATHER CONDITIONS: Sunny <br />WORK REQUESTED: Densiry tests <br />CONTRACTOR: West Elk Mine FOREMAN: Henry Barbe <br />WORK PERFORMED BY LAMBERT AND ASSOCIATES REPRESENTATIVE (AND REMARKS) <br />I amved at the project site at 11:00 a.m. and 12:30 p.m., as requested by Henry Barbe. I performed soil <br />density tests, as requested by Mr. Barbe, of material being placed for gob fill, using nuclear soil density <br />test methods. Please refer to the test results sheet for approximate test locations and test results. The test <br />area was determined by Henry Barbe. The test results indicate only the relative compaction and soil. <br />moisture content of the material tested at the elevation and location tested at the time of our site visit. <br /> <br />~~C~IyE[R <br />SEP 1 p 2004 <br />WEST ELK M1NE <br /> <br />p.0. Box 9988 P.D. Box 0065 214 Boda DHve <br />;unction, CO 87502 Monhose. GO 81s0Y n~~.~~~~ ~~ ~+an+ <br />