Laserfiche WebLink
Bear Coal Company <br />9 <br /> <br />July 27, 1994 <br />In May of 1944 UTE established three (3) new stations in Lone <br />Pine Gulch. See map for location. The values for the July, 1994 <br />survey are as follows: <br />STATION U25 <br /> <br />May, 1994 399,159.59 1,437,752.92 6651.10 <br />July, 1994 399,159.32 1,437,782.73 6651.30 <br />Mean 399,159.46 1,437,782.82 6651.20 <br />STATION U26 <br /> <br />May, 1994 399,450.63 1,438,169.59 6908.94 <br />July, 1994 399,450.56 1,438,169.42 6909.04 <br />Mean 399,450.60 1,438,169.50 6908.99 <br />STATION U27 <br /> <br />May, 1994 399,785,83 1,438,445.67 7132.25 <br />July, 1994 399,785,85 1,438,445.38 7132.12 <br />Mean 399,785,84 1,438,445.52 7132.18 <br />Slope Stability Stations at Bear #3 Are Tied to D-11-U and D-12-U <br />through a series of primary loops: <br />Bear #3 U 16 <br />U 17 <br />U 18 <br />U 19 4 <br />U 23 5 <br />U 24 6 <br />Table 2 is a list of slope stability Stations with their coor- <br />dinates and elevations from August, 1985, through July, 1994 and <br />the resulting mean values. <br />4 Monument = #5 Rebar <br />6 Monument = #7 Rebar in concrete <br />Monument = #6 Rebar <br />