My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP18095
DRMS
>
Back File Migration
>
Report
>
REP18095
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:47:01 PM
Creation date
11/27/2007 2:18:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
Report
Doc Date
6/7/2002
Doc Name
2002 Annual Report
From
Sunnyside Gold Corp
To
DMG
Permit Index Doc Type
Annual Fee / Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Reclamation Activity <br />April 2001 - March 2002 <br />Page 9 <br />4) Mine Pool <br />The mine pool water is no longer accessible for monitoring <br />with the final closure of the Terry Tunnel and placement of <br />the American Tunnel #2 Bulkhead. Monitoring at the #2 bulkhead <br />reflects water quality between the American Tunnel bulkheads <br />and remained within bulkhead design parameters. <br />MONITORING - Settling, phreatic water levels and bulkhead <br />inspections <br />Included in Appendix A are settlement monitoring data for Tailings <br />Pond No.4, phreatic water level monitoring for Tailings Pond No.4 <br />and American tunnel pressure gage readings indicating final depth <br />of mine pool and pressure rise on the American Tunnel #2 Bulkhead. <br />Tailings Pond No.4 settling and phreatic level monitoring does not <br />reveal any adverse trends. The phreatic level remained low since <br />pond reduction occurred. <br />Monitoring of the bulkhead pressure gage in the American Tunnel #1 <br />Bulkhead ended with final pipe and valve grouting. As of May 14, <br />2001, the pressure was 438 psi which reflects a pool surface <br />elevation of 11,661 feet MSL. With some annual variation, this <br />level reflects mine pool physical equilibrium. <br />The American Tunnel Bulkhead #2 pressure has been monitored since <br />valve closure on August 31, 2001. Pressure has continued to rise <br />throughout the report year although it is well below design <br />pressure. PH and sulfate levels have also remained below design <br />criteria for the bulkhead. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.