My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP18095
DRMS
>
Back File Migration
>
Report
>
REP18095
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:47:01 PM
Creation date
11/27/2007 2:18:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
Report
Doc Date
6/7/2002
Doc Name
2002 Annual Report
From
Sunnyside Gold Corp
To
DMG
Permit Index Doc Type
Annual Fee / Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Reclamation Activity <br />April 2000 - March 2001 <br />Page 6 <br />Activity planned for 2002 includes; <br />1) monitoring and maintenance of vegetation on the remaining <br />area. <br />BULRHEADS - TR-19 / TR-16 / TR-22 / TR-23 / TR-25 <br />Activity on this project during the 2001 reporting year consisted <br />of; <br />1) the continuation of the seep, spring and flowing adit <br />inventory required by TR-14. Twenty percent of the sites were <br />required to be sampled and all sites monitored for field <br />parameters twice. SGC monitored each site twice (if flow <br /> existed) and sampled more than twenty percent of the sites <br /> during the field season. Summary sheets of the data collected <br /> are included in Appendix B. <br />2j monitoring of the voluntary Consent Decree agreement projects. <br /> The A List projects were completed and inspected by October <br />1997. The last B List project implemented was approved in <br /> 2000. <br />3) permanent closure of the #1 Bulkhead in the American Tunnel <br /> after the approved waiting period after equilibrium was <br /> established. <br />4j placement of a #2 Bulkhead in the American Tunnel. This was <br /> completed during the report year. <br />5) monitoring the #2 Bulkhead for physical equilibrium, pH and <br /> sulfates. <br />Planned activity for 2002 includes; <br />1j permanent closure of the American Tunnel #2 bulkhead after <br />physical equilibrium is reached. <br />2) placement of the American Tunnel #3 Bulkhead. <br />3) monitoring and maintenance for the completed Consent Decree <br />Mine Remediation Projects. <br />3) continuation of the seep, spring and flowing adit inventory <br />and monitoring. <br />• <br />