My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP18070
DRMS
>
Back File Migration
>
Report
>
REP18070
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:47:00 PM
Creation date
11/27/2007 2:18:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Report
Doc Date
3/5/2004
Doc Name
2003 Annual Hydrology Report
From
J.E. Stover & Associates
To
DMG
Annual Report Year
2003
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• SNOWCAP COAL COMPANY <br />2003 ANNUAL HYDROLOGIC REPORT <br />OCTOBER 1, 2002 THROUGH SEPTEMBER 30, 2003 <br />Introduction <br />During the 2003 Water Year, the "Year", the mines were idle. Mining ceased at the <br />Roadside Portals on December 2, 1999. The North Mine was sealed on February 10, <br />2000. The Roadside South Mine was sealed on April 12, 2000. The South Fan was <br />sealed May 22, 2000. The 2 West Portals were sealed on April 24, 2000. Production at <br />the Roadside North utilized room and pillar mining with a continuous miner and shuttle <br />cars. <br />Reclamation of CRDA-2 was completed in 2002. The sediment retained by the drop <br />structures in Coal Canyon was harvested for cover material. Material excavated during <br />construction of the upper diversion ditch was also used as cover material. A small amount <br />of cover material was obtained from CBA-1. Topsoil was obtained from Topsoil Stockpiles <br />2, 7, 8 and 9. Reclamation of CRDA-1 was also completed in 2002. Cover material was <br />• obtained from CBA-2. The road to CRDA-1 was left open to accept coal and refuse <br />material from other ongoing reclamation activities. The road begins at the west end of Haul <br />Road No. 5 and extends to the top of CRDA-1. <br />The North Portal was regraded to approximate original contour during 2002. Backfill <br />material came from areas filled near Coal Creek and around the coal stockpile area. <br />During 2002 the RSRDA was graded to final contours. The existing cover was graded off <br />of the slope and used as cover below the first bench. Refuse material was cut from the <br />pile to establish two 10' - 15' wide benches on 30' to 40' elevation intervals. This refuse <br />material was placed in an extension of the pile to the north. Cover material was obtained <br />from the RSRDA borrow area. <br />During 2003, a portion of the conveyor corridor was regraded and seeded. This work <br />extended from the culvert under Excel's frontage road to the culvert underthe railroad Loop. <br />The conveyor bridge over the Colorado River was removed during the year. <br />The general format of this report is the same as in previous years. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.