Laserfiche WebLink
2/6/2006 2:53 PM FROM: Fax Tipton Nining Consul[ants T0: 1]1960]3156 PAGE: 004 pF 005 <br />' VaaY~61 ~d ~1I{lW R VM~~ <br />~~iM~ <br />r~iW <br />71irliwe: (11l9iDt7~itl! <br />F~ rn~ fi~b7313f <br />Date: 2!6/06 <br />To: The Division of Minerals & Geology <br />From: Gilieae Sand & Gravel Inc. <br />Re: Technical Revision far Mine Road Detota• <br />Attn: Berhan KeffeIew <br />Dear t3erhan, <br />JAN 2 4 2001 <br />®Niaion ofRooiamation, <br />Mlnin~ nfld Safety <br />As stated in the annual report for 2005, an area of disturbance to the South of the <br />current Road Base excavation is anticipated and will need to have an <br />accompanying mad detourofapproximatehy 650 ft This road will be temporary, <br />16 ft wide and have adequate ditches on either side to aoooanrtodate all <br />precipitation runoff events for that localized area. <br />This detour will allow access to neazly 1.5 acres of new Road Base nratedal and <br />will be reclaimed and restored is accordance with the apluoved Rechatnation PLut <br />when mining in that area is concluded. At that point, awell-graded mad with <br />eccompenyiag ditches will be replaced along nearly the same trap view as the one <br />is cturetttly. ' <br />The area of surface disturbance az this time is measured at nearly 8.3 acres alai <br />with the addirian of I.5 acres of new disturbance; the total disturbed area will still <br />exist well within the 10 acres cunsgtly bonded. ' <br />Thank you for your prompt attention on this matter. <br />Sincerely, <br />s Pyles <br /> <br /> <br />