My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP17978
DRMS
>
Back File Migration
>
Report
>
REP17978
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:46:55 PM
Creation date
11/27/2007 2:16:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Report
Doc Date
5/26/2005
Doc Name
1st Quarter 2005 Waste Bank Inspection Reports
From
Peak Project Management, LLC
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New Elk Mine <br />QUARTERLY COAL WASTE BANK INSPECTION REPORT <br />CDMR Rules 4.09.1(11) and 4.10.2(2) <br />Mine: NEW ELK <br />Waste Bank MSHA ID. No.: Primary Refuse Disposal Area (RDA) <br />Inspection Period: First Quarter 2005 <br />Inspection Date: 3/17/2005 <br />General Description or Reference to Site Plan: <br />The Refuse Disposal Area is located north of State Highway 12 and the Middle Fork of the <br />Purgatoire River. Refuse was transported from the preparation plant to the RDA by conveyor belt. <br />The plant has been idle since March of 1996 at which time the last refuse was placed on the <br />fill area. <br />Activity During Inspection: <br />Operator completed grade work on the upper surface of the RDA in January 2005. Since completion, <br />the facility has been idle. Periodic snowfalls have melted with no significant run-off to Pond 8. The <br />recontoured surface appears to have retarded melting and run-off from the active area. <br />Drainage: (Discussion of springs. seeps, overiand and channel flow, undenirain construction and/ <br />or discharge, integrity of 100.year 24hour drainage structures, and evidence of positive drainage). <br />No springs or seeps were observed on the refuse side slopes. Positive drainage is established on <br />all areas. Vegetation is well established on previously reclaimed areas. <br />Observation of Fill Construction: (Description of material, compaction, lift thicknesses, slopes, <br />and construction methods). <br />Previously placed fill material has been regraded to promote managed drainage from the extensive <br />surface area (approximately 20 acres). Reworked material was placed in no greater than two foot <br />lifts and compacted with a D-8 dozer during placement. <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.