My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP17978
DRMS
>
Back File Migration
>
Report
>
REP17978
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:46:55 PM
Creation date
11/27/2007 2:16:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Report
Doc Date
5/26/2005
Doc Name
1st Quarter 2005 Waste Bank Inspection Reports
From
Peak Project Management, LLC
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New EIk Mine <br />QUARTERLY COAL WASTE BANK INSPECTION REPORT <br />CDMR Rules 4.09.1(11) and 4.10.2(2) <br />Mine: NEW ELK <br />Waste Bank MSHA ID. No.: Development Waste Disposal Area <br />Inspection Period: First Quarter 2005 <br />Inspection Date: 3/17/2005 <br />General Description or Reference to Site Plan: <br />The Developmenl Waste Disposal Area is located south of State Highway 12 and west of <br />the main facility Access Road. It is adjacent to and north of the Middle Fork of the <br />Purgatoire River. The area has been used for disposal of waste rock from the underground <br />mine. Since mine closure in 1989, the area has been used for disposal of sediment removed <br />from ponds and ditches located within the mine permft area. <br />Activity During Inspection: <br />Area has been idle since last quarters inspection. Ground is frozen with some snow <br />remaining on north facing slopes. <br />Drainage: (Discussion of springs. seeps, overland and channel flow, underdrain construction and/or <br />discharge, integrity of 100-year 24hour drainage structures, and evidence of positive drainage). <br />Positive drainage is maintained on the surtace of the DWP. No evidence of springs nor seeps <br />was observed. <br />Observation of Fill Construction: (Description of material, compaction, lift thicknesses, slopes, <br />and constriction methods). <br />No additional fill material has been placed during the quarter. No significant erosion was observed <br />on the side-slopes. Drainage ditches were clear of any sediment accumulation. <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.