Laserfiche WebLink
COLORADO DIVISION OF MINERALS AND GEOLOGY <br />ANNUAL REPORT FOR <br />SPEER MINING RESOURCE <br />M-1983-176 AM-3 <br />ASPHALT SPECIALTIES CO., INC. <br />DECEMBER 9, 2003 TO DECEMBER 9, 2004 RECEr ~: ~ , <br />DEC Q ~ ~~- i <br />1. TOTAL ACRES IN PERMIT AREA: 75.5 <br />QIYISIORd Mine~_~; -_ <br />~.~ GaolagY <br />2. TOTAL PERMITTED MINEABLE ACRES: 57.2 <br />3. CURRENT TOTAL ACRES DISTURBED: APPROX. 52.6 <br />4. TOTAL ACRES MINED DURING REPORT YEAR: APPROX. 8.85 <br />5. CURRENT TOTAL ACRES IN VARIOUS STAGES OF RECLAMATION: <br />APPROX. 9.5 <br />6. TOTAL ACRES RECLAIMED DURING REPORT YEAR: NONE <br />7. APPROXIMATE ACREAGE TO BE MINED IN NEXT REPORT YEAR: 11.0 <br />8. APPROXIMATE ACREAGE TO BE RECLAIMED IN NEXT REPORT YEAR: <br />7.0 <br />Mining during the report year continued on this permit site in Area 3, where it was <br />completed for mining and in Area 4, that was also completed for mining. Re-naming of <br />the mining areas is due to approval of expansion amendment AM-3 in 2004. Please refer <br />to the attached Annual Report Map. Overburden from these areas was placed into the <br />existing area of overburden placement against the pit side on the western edge of the pit. <br />Mining continued into the new amendment azea (Area 4) to the south and was completed. <br />No seeding or revegetation was implemented on this permit site, as the overburden <br />stockpiles aze in various stages of disturbance with the addition and subtraction of <br />material. Backfill along the pit-side of the high-water mark of the South Platte River in <br />Area 1 is the only reclamation activity that occurred on this permit during the reporting <br />yeaz. <br />Mining during the next reporting year will continue in Area 1 to the south and southwest, <br />in the area of the current plant site, to the approved limits of mining. The gravel plant <br />operation will be moved into the current pit floor just to the north of where the plant is <br />now. Reclamation during the next reporting year should be implemented as revegetation <br />on the lower bench (Area 2) and will be completed in this area. <br />