My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP17856
DRMS
>
Back File Migration
>
Report
>
REP17856
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:46:49 PM
Creation date
11/27/2007 2:15:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977129
IBM Index Class Name
Report
Doc Date
9/21/1981
Doc Name
ANNUAL REPORT MLR 77-129 WHITEWATER BLD MATERIALS CORP WHITEWATER PIT 500 MESA CNTY
From
WHITEWATER BUILDING MATERIALS CORP
To
MLR
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•~ <br />• © A <br />SAND & GRAVEL <br />PRODUCTS <br />September 2, 1978 <br />Mined Land Reclamation Bo. <br />1313 Sherman Street, Room <br />Denver, Colorado 80203 <br />Gentlemen: <br />Mining and reclamation are procee ing on sc <br />reclamation plans and time tables 'n the or <br />Reference is made to MLRB Rules and <br />2.41 (1) (a) Mining operations in S~ <br />scheduled. Approximat <br />(see map D-1 or D-lA). <br />(b) Operations in Stage X, 1 <br />schedule. Approximately <br />planned (see map D-1 or, <br />READY MIXLD <br />CONCRETE <br />Re: Annua~eport. - ~II,R File No. 77-129 <br />Whitew ter Building Materials Corporation <br />White ater Pit 500 - Mesa County <br />'in accordance with the mining and <br />application. <br />tion~, amended December 1977, Section 2.40: <br />0, 974-1977, were completed as <br />7. S+ acres were affected as planned <br />1980, were completed ahead of <br />75+ acres were affected as <br />(c) Mining operations in rage I, 1978-1981, are continuing as <br />planned. We have of ected ap roximately 5.80 acres this year <br />(see map D-1 or D-1 ). <br />(d) Mining operations in Stage A, 1 7-1981, are continuing as <br />planned. We hav affected appro "mately 1.25+ acres this <br />year (see map D or D-lA). <br />(2) (a) Reclamation P se 0, 1978-1982, is 'n the process of regrading <br />and sloping prescribed. Planned evegetation will not be <br />carried out ntil the fall of 1979 b cause regrading and sloping <br />will contin a into at least mid-winte of this year. <br />(b) Reclamati Phase X, 1981-1985, is ahea of schedule with regrading <br />and shap g complete. Road graveling wi 1 occur this fall, and <br />it is h ed that the planned revegetatio will be possible during <br />the 197 fall planting season. <br />(c) Phase/I - no reclamation scheduled until 19,2. <br />WNITEWATER-BUILDING MATERIALS CORPORATION <br />Phone 242-4843 or 242-7537 P. O. Boz 1769 <br />8{0 SOLW 10th Street <br />GBAND JIINCTION, COLOSADO 81501 <br />(d) Phas,~ A - no reclamation scheduled until 1982 <br />
The URL can be used to link to this page
Your browser does not support the video tag.