Laserfiche WebLink
- ~~ <br />Mined Land Reclamation <br />September 21, 1981 <br />Page 2 <br />2.41(4) No planting was scheduled for thi:~ year. <br />(5) No fertilizing was scheduled for this year. <br />(6) An appraisal of reclamation performed to date indicates <br />that revegetation is rather slow but is successful. <br />'~ Grading and backfill areas are proceeding according to <br />plan. <br />' (7) Mining of the remaining 4.231 acres in Stage I will be <br />continued, and excavation on four or five acres in <br />Stage II may be started. Mining will also continue in <br />i, Stage B in a small area. In addition, by a pending <br />amendment, we expect to start mining Stage C which <br />will affect about 3.OOt acres in the coming year. The <br />amended Stage C will be the oid Stage D, Part 2 (see <br />map). <br />(8). The annual report date is September 22. The effective <br />date of all information herein is September 1, 1981. <br />2.42 The operator's annual fee in the amount of $350 is <br />attached. Please sign below to indicate receipt of the <br />annual report and the fee. Please return two copies of <br />this letter to us. <br />Yours truly, <br />WHITEWATER BUILDING MATERIALS CORPORATION <br />dward M. Gardner, President <br />Receipt <br />CHECK NO. 1077 from Whitewater Building Materials Corp- <br />oration RECEIVED this day of November, 1981. <br />MINED LAND RECLAMATION <br />By <br />