Laserfiche WebLink
ACTUAL RECLAMATION COSTS <br /> Area 3 Existing Settling Pond (1 acre) <br /> This area will be graded (backfilled if necessary) , topsoiled , seeded <br /> and mulched. Soil testing and fertilizing will also occur. <br /> (1) Grading = $77.09 <br /> 1 acre @ 0.5 hr/acre @ $154. 18/hr = $77.09 <br /> Utilize Caterpillar D-9 Dozer <br /> (2) Scarifying the Graded Surface = $31.02 <br /> 1 acre @ $31.02/acre = $31.02 <br /> Utilize Caterpillar 14G Motor Grader <br /> (3) Topsoil Replacement = $293.51 <br /> Utilize Caterpillar 637D Scraper <br /> (Sediment found in pond may prove to be suitable for <br /> replacement as topsoil If not , approximately four (4) <br /> inches will be replaced from a stockpile located around <br /> 1,000 feet away. <br /> (4 inches) x (1 ft/12 inches) x (1 acre) x <br /> (43,560 ft2/acre) x (1 cu yd/27 ft3) = 538 cu yd <br /> Production for 1 ,000 ft one-way haul = 500 bcy/hr <br /> 538 bcy s 500 bcy/hr x $272.78 = $293.51 <br /> (4) Soil Testing and Fertilizing = $51 <br /> 1 acre @ $51/acre = $51 <br /> (5) Seeding & Mulching = $231. 16 <br /> 1 acre @ $231. 16/acre = $231. 16 <br /> -12- <br />