Laserfiche WebLink
ACTUAL RECLAMATION COSTS <br /> Area 1 Planned West Mining Area (16 acres) <br /> This area will be graded, topsoiled, seeded, and mulched. Soil testing <br /> and fertilizing will also occur. <br /> (1) Grading = $1 ,233.44 <br /> 16 acres 0 0.5 hr/acre @ $154. 18/hr = $1 ,233.44 <br /> Utilize Caterpillar D-9 Dozer <br /> (2) Scarifying the Graded Surface = $496.32 <br /> 16 acres @ $31 .02/acre = $496.32 <br /> Utilize Caterpillar 14G Motor Grader <br /> (3) Topsoil Replacement = 52,542.67 <br /> Utilize Caterpillar 637D Scraper <br /> (Approximately four (4) inches to be replaced from a <br /> stockpile located only 200 feet away. Topsoil <br /> replacement needed on actual mining area of about nine <br /> (9) acres. ) <br /> (4 inches) x (1 ft/12 inches) x (13 acres) x <br /> (43,560 ft2/acre) x (1 cu yd/27 ft3) = 6,991 cu yd <br /> Production for 200 ft one-way haul = 750 bcy/hr <br /> 6,991 bcy - 750 bcy/hr x $272.78 = $2,542.67 <br /> (4) Soil Testing and Fertilizing = $816 <br /> 16 acres @ $51/acre = $816 <br /> (5) Seeding & Mulching = $6,068.56 <br /> 16 acres @ $231.66/acre = $3,698.56 <br /> 3 acres @ $790/acre (seedling plantings) = $2,370.00 <br /> (6) Miscellaneous = $0 <br /> TOTAL AREA 1 COSTS = ?11 ,156.99 <br /> -10- <br />