My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP17779
DRMS
>
Back File Migration
>
Report
>
REP17779
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:46:46 PM
Creation date
11/27/2007 2:14:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
6/8/1992
Doc Name
1991 ANNUAL MINE INFLOW REPORT
Permit Index Doc Type
MINE INFLOW REPORTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />1991 ANNUAL MINE INFLOW REPORT <br />Introduction <br />In compliance with Stipulation No.29, Permit No. C-81-038, <br />Cyprus orchard Valley Coal Company submits the following Annual <br />Mine Inflow Report for the period of July 1, 1990 through June 30, <br />1991. <br />Mining Locations and Projections <br />Pillar retreat mining of Panel H was underway in July, 1990 <br />and continued through September. Entry development of the II West <br />Submains was continued to access Panel A+. The first four <br />crosscuts of Panel A+ were completed by December 1, 1990. Mining <br />emphasis was then shifted to the advance development of Panel A. <br />Advance development of Panel A was completed by mid-April and <br />pillar retreat mining of the northernmost portion of this panel <br />continued through June. <br />Overcast construction and the initial advancement of the II <br />West Submains to the western portion of the lease area was <br />undertaken in June, 1991. <br />Mining projections for <br />1992 include the completion <br />retreat mining in Panel B. <br />Submains to the west of Ea: <br />Long Term Mine Planning Map <br />Mine Inflow <br />the period of July, 1991 through June <br />of mining in Panel A, and advance and <br />Further development of the II West <br />~t Roatcap Creek (see Permit Term and <br />No. 2-5) will continue as well. <br />The mine inflow study at the Orchard Valley West Mine was <br />completed during June, 1991. Pillar retreat mining in Panel A was <br />underway during this time. No measurable inflows were noted during <br />the mine inflow inspection. Seven locations exhibited minor <br />seepage from both roof and floor sources, while five locations were <br />mapped as having accumulated water in sumps. Two additional <br />locations were mapped this year as exhibiting minor flows <br />potentially associated with faults or rock spars within the mine. <br />No measurable flows from either of these sites occurred during the <br />monitoring tour but wet conditions were noted in these areas of the <br />mine shortly after they were developed. <br />The inflows at the Orchard Valley West Mine continue to <br />consist of seepage from both the roof and the floor with roof <br />seepage appearing more predominate in 1991. Seeps continue to <br />exhibit the characteristic pattern expected when mine workings <br />intercept perched aquifers; flows dissipate and essentially cease <br />. anywhere from one to four weeks after interception by mine <br />workings. Seeps encountered during the 1991 monitoring failed to <br />
The URL can be used to link to this page
Your browser does not support the video tag.