Laserfiche WebLink
<br />July 27, 1998 <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />JU_ _ ~_~3 <br />DIV. OF MINERALS <br />8 GEOLOGY__ <br />Re: Battle Mountain Resources, Inc. - San Luis Project <br />DMG Permit No. M-88-112, TR-010 <br />Weekly Pond Compliance Report _ _ <br />July 19 - J/u/l~'y//{\2 5 , 19 9 8 <br />Dear Mr. Dillie :l ,~y y <br />Attached is a summary of the on-site cyanide analysis performed on <br />samples from the tailings pond and the collection pond during the week <br />of July 19 - July 25, 1998 as required by the approved TR-010. <br />During the week, the tailings pond averaged <0.010 ppm CN-wad and 0.060 <br />ppm CN-total. The collection pond averaged 0.023 ppm CN-wad and 0.041 <br />ppm CN-total. <br />Sincerely, <br />Ron Zumwalt <br />cc: Bill Lyle <br />Dan Robertson <br />