Laserfiche WebLink
1997 Rill and Gully Monitoring <br />Yoast Mine <br />During April and May, Seneca reclamation personnel conducted the annual rill and <br />gully survey at the Yoast mine. Following is a list of projects and actions for June, <br />July and August 1997: <br />• Erosion of road fill in numerous places along A and B Haul roads where berm <br />drainage flows off of road--riprap <br />• Erosion of road cut in a few places along A and B Haul roads--reseed <br />• Erosion at inlet to pond 10--riprap as needed <br />