Laserfiche WebLink
RECEIVED <br />JAN 22 2002 <br />Bowie Resources Ltd. Division of Minerals 8 Gec~r~~ <br />Bowie #1 Mine <br />Quarterly Waste Disposal Area Inspection Report <br />4"" Quarter of 2001 <br />item YesiNo Comments <br />1 Ouanlity of waste material added to waste disposal <br />area during reporting period. Yes Approximately 3,000 yd' was added to pile during this <br />reporting period. <br />2 Waste material deposited and compacted in <br />24 inch lifts? No Yes. Material was deposited and compacted in <br />24-inch lifts. <br />-Tes ~ R.~s ~ ors A ~ ra u+o D <br />3 Drainage alterations constructed? No No drainage alterations were constructed during the <br />quarter. The existing drainage pattern was maintained <br />around the perimeter of the pile to protect oulslopes <br />and direct drainage a[ [he toe of [he pile. <br />4 Present height of waste material? Highest height approximately 99.0 feel. <br />5 New bench constructed? No <br />6 Refuse material oulslopes placed a[ 1V:244outslopes? N!A Refuse added to pile was sloped at 1V:2H slope. <br />7 Adequate drainage on top of completed till? Yes <br />8 Bench drainage adequate? Yes <br />9 Oufsfopes covered with 4 (oot non-toxic, <br />non-combustible material? N/A Out slope was covered with 4-(oot ofnon-toxic, <br />- r.-combustible material. <br />10 Berms constructed on oulslopes? Yes <br />11 Evidence of structural defects? No <br />12 Topsoil adequately salvaged and stored? N/A No additional topsoil was salvaged from this pile this <br />quarter. <br />13 Trash removed? Yes <br />14 Additional comments? <br />poems No <br />I ~A~~ ~~j~L(34ggi~l as being accuratge to the best of knowledge and all fill has been constructed as <br />• ~. ~,. •~ ,FF <br />i ~@cfrBd inghekl~siQr1'~p~roved by the Division. <br />~, <br />O n~ ~/ ~O <br />0 ~r <br />7 <br />~ Si~nature - ~'~~ Da[e <br />-~ ~ ~4, i <br />'~S%or~c~ E~,. <br />4-2001 ^ s, _ 4-2001 <br />