Laserfiche WebLink
01/16/2002 06:49 9709295256 BOWIE RESOURCES LTD PAGE 12 <br />~~E1'~ ~CYC~ ~.£.'~IIJC'C~[~E~ <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY F[ELD REPORT <br />PROTECT NUMBER: Iv102003MT DATE: Thursday 1-03-02 <br />PROJECT NAME: Waste Coal Pile (Wes[ Ridge Pile) <br />PROJECT LOCATION: Paonia, CO <br />CLIENT: Bowie Resources <br />CONTRACTOR: Palisade Constructors <br />TECHNICIAN: Hayes <br />WEATHER CONDITIONS: Clear <br />WORK REQUEcT>=n• ne*+~,av tests <br />FOREMAN: Chris Marx <br />WORK PERFORMED 8Y LAMBERT AND ASSOCIATES REPRESENTATIVE (AND REMARKS) <br />I arrived at the project site at 12:00 p. m. as requested by Mr. Greg Homan. I performed soil density <br />tests as requested by Mr. Efoman of material being placed on the gob pile using nucleaz soil density <br />test methods. Please refer to the test results sheets for approximate test locations and test results. <br />The test results indicate only the relative compaction and soil moisture content of the material tested <br />at the elevation and location tested at the time of our site visit. <br />p,O. BOY 0045 214 BoOo DAve <br />P.O. Box 3986 Ourangc, CO 81301 <br />Montrose, CO 81402 t970) 259-4095 <br />Grand .lunation. CO 81502 1970) 249.2154 FAX: 19701 s82.2s1 s <br />(970) 245-fi506 FAx: 1910) 249 3282 <br />FAX: (9701248.9758 <br />