<br />ANNUAL REPORT
<br />INSTRUCTIONS
<br />According to C.R.S. 34-3?-l 16(3), and C.R.S. 34-325-116(3)(a), on the a
<br />the operator shall submit a report and a map showing the extent of torten[
<br />reclamation accomplished to dale and during the preceding year, new disn
<br />during [he upcoming yeaz, and reclamation that will be performed during I
<br />a report and map to enclosed annual report form. (An adequately labeled
<br />the above elements may suffice For a written report.)
<br />If your operation is subject to the provisions of Temporary Cessation as der
<br />provide with the Annual Repor[ [he following information as required by 2
<br />1.13.7(1)(a):
<br />(I) the condition of the operation at the time of cessation;
<br />(ii) what specific measures have been and will be implemented to
<br />performance standazds and Environmental Protection Plan require
<br />approved application; and
<br />(iii) plans for resumption of mining operations.
<br />Please provide the additional following information with your Annual
<br />iversary dale of the permit each year,
<br />turbances to affec[ed land,
<br />antes [ha[ are anticipated to occur
<br />upcoming year. Please attach such
<br />~ that clearly delineates and includes
<br />in the Act and Rules, you must
<br />.407-1, 407-~, and Rules
<br />y with reclamation,
<br />if they aze par[ of your
<br />as applicable:
<br />(a) Per the requirements of 2 CCR 407-I, 407, and Rules 1.15(1, provide an updated statement
<br />regazding the sufficiency of the value of the Financial Warranty, spectfically:
<br />m Per the requirements of 2 CCR 407-1, 407-4, and Rules ~1.15(1)(a), provide an updated
<br />statement regazding the sufficiency of the value of the financial warranty. Specifically,
<br />irrevocable letters of credit, Deeds of Trust, and security agieements,'self-insurance, salvage
<br />credit, and fits[ priority liens on project related fixtures.
<br />- (ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules
<br />"" Deed of Tmst or a Security Agreement, the operator shall s
<br />independent appraiser, indicating any changes in property ~
<br />any circumstances which may affect the adequacy of the Dt
<br />and the value of the property subject to either of these insm
<br />The report shall also provide proof that there are no past-du
<br />(iii) Per the requirements of 2 CCR 407-I, 407, and Rule
<br />Irrevocable Letter of Credit, the operator shall have the ban
<br />of a balance sheet, certified by a Certified Public Accountai
<br />Letter of Credit does not exceed ten percent (10%) of the b;
<br />15(1)(b), permits secured with a
<br />nit an update, by a qualified
<br />te, and a statement summarizing
<br />of Ttvst, or Security Agreement,
<br />property taxes.
<br />4.7(3), permits secured with an
<br />provide documentation in the form
<br />demonstrating that the
<br />tk's capital surplus accounts.
<br />(vi) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.9.3(c), permits secured by a First
<br />Priority Lien on any fixmres and Equipment, the operator shall provide a repots in sufficient
<br />detail to fully describe the condition, value, and location of fall pledged fixtures
<br />and equipment.
<br />(b) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(':
<br />required as part of the approved permit application, to include the
<br />(Please note that if you are not a Designated Mining Operation, yt
<br />Protection Plan as part of your approved permit.)
<br />c), all moni[oring information
<br />nvironmental Protection Plan.
<br />will not have an Environmental
<br />
|