My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP17665
DRMS
>
Back File Migration
>
Report
>
REP17665
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:46:40 PM
Creation date
11/27/2007 2:12:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987026
IBM Index Class Name
Report
Doc Date
9/19/1994
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 110 2 ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ <br />• I~I II~ ~~ ~ • <br /> <br />Notice of Intent cu ~.,~~sss.__ I~~ <br />ng Operations <br /> 110(2) Annual Report <br /> RFCF_IVER <br />Permittee Name: Colorado Quarries Inc <br />Permit No: M-87-026 <br />* ~~P l~ ~~~~ <br />Operation Name: Black Obsidian <br />Anniversary Date: 11/06/94 <br />Total: $225.00 (Due on your Annive~rs,arry„p~i:,e;)aissGeo!ogy <br />1. a. Permitted acreage: ~ b. County where mine is located: ~ iJ S ~ <br />2. Has this mine been granted TEMPORARY CESSATI ON STATUS? YES (Rb <br />Does this min e operate MORE or LESS than 180 days per year? MORE ~C SAS _._ <br />Do you extrac t MORE or LESS than 70,000 tons of mineral or <br />overburden a year? MORE Q~`SS <br />3. Does this mine have a phased reclamation plan? YES mTU <br />4. Total acres affected during the report year:* <br />5. Total acres reclaimed for the report year:* <br />6. Total acres in various stages of reclamation:* <br />a, Backfilled: o d. Topsoil replaced: c:U <br />b. Graded: 0 Average topsoil thickness <br />replaced: T <br />c. Seeded: <br />List species seeded & seeding <br />rate for report year on back <br />7. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* Q <br />8. Estimated total acres to be affected irn the next report year:* '=~~%~~r~~ <br />9. C.~OMMENTS: .`7~/..'~r ~~/~s`\ ~JY ~Ltr/~~v4~~i~+~iDr' ///~ilr*. <br />* Please show the location of the acreage for items 4 - 6 on your map**. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. <br />** N~IE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, this must be stated above. <br />Signature: ui~Pi~Q~~~ Date: Gr~.l - ~~ <br />Please type or print current contact name, mailing address, and phone number below: <br />Contact Name: ~(/ /~ ~ ~'+=7/C ~ Phone: (//~l )L %~ ~ ~r~y <br />Company: ;f~~/a~~~r-~a ~Y~i~-i%/E=S <br />Address: ~ ~~ ~ %~ y<< ~ f (,~~ <br />~` .i 2xJ f4 ~y/ y$,~ <br />,/_ ~~ <br />Federal Tax ID No. or Social Security No.: ~~ 0, ~ _ i~ k '- lI/~ _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.