My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP17640
DRMS
>
Back File Migration
>
Report
>
REP17640
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:46:39 PM
Creation date
11/27/2007 2:12:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986076
IBM Index Class Name
Report
Doc Date
1/1/2000
Doc Name
ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ANNUAL REPORT ~ j <br />INSTRUCTIONS <br />According to C.R.S. 34-32-116(3), and C.R.S. 34-32.5-1 161.3)(x), on the anriversary date of the permit each year. <br />the operator shall submit a report and a map showine the e.etent of current disturbances to affected land, <br />reclamation accomplished [o date and during the preceding Year, new disturbances that are anticipated to occur <br />during the upcoming year, and reclamation that will be performed during the upcoming year. Please attach such <br />a report and map to enclosed annual report form. (An adequately labeled map that clearly delineates and includes <br />the above elements may suffice for a written report.) <br />[f your operation is subject [o the provisions of Temporary Cessation as defined in the Act and Rules, you must <br />provide with the Annual Report the followine information as required by 2 CCR d07-I. 407-4, and Rues <br />1.13.7(I)(ai: <br />(i) the condition of the operation a[ the time of cessation: <br />(ii) what specific meas'ttres have been and will be implemented to comply with reclamation. performance <br />standards and Environmental Protection Plan requirements, if they are part of your approved application; and <br />(iii) plans for resumption of mining operations. <br />Please provide the additional fol{owing information with your Annual Report. as applicable: <br />(a) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(11, provide an updated statement <br />regarding the sufficiency of the value of the Financial Watranty, specifically: <br />(i) Per the requirements of 2 CCR -407-1. =107-d, and Rules ] .15j l)(a), provide an updated <br />statement regarding [he sufficiency of the value of the financial warranty. Specifically, <br />irrevocable letters of credit. Deeds of Trust, and security agreements, self-insurance, salvage <br />credit, and first priority liens on project related fixtures. <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(b), permits secured with a <br />Deed of Trust or a Security .Agreement. the operator shall submit an update, by a qualified <br />independent appraiser, indicating any changes in propetty valae, and a statement summarizing <br />any circumstances which may affect the adequacy of the Deed of Trust, or Security agreement, <br />and the value of Che propetty subject to either of these instruments. The report shall also provide <br />proof that there are no pas[-due property taxes. <br />(i) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.7(3), permits secured with an <br />h-revocable Letter of Credit, the operator shall have [he bank provide documentation in the form <br />of a balance sheet, certified by a Certified Public Accountant, demonstrating that the Letter of <br />Credit does not exceed ten percent (]0%) of the bank's capital surplus accounts. <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.9.3(c), permits secured by a First <br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient <br />detail to fully describe the condition, value, and location of all pledged fixtures and equipment. <br />(b) Per the requirements of 2 CCR 407-], 407-4, and Rules 1.15(1)(c), all monitoring information <br />required as part of the approved permit application, to include the Environmental Protection Plan. (Please <br />note that if you are not a Designated Mining Operation, you will not have an Environmental Protection <br />Plan as part of your approved permit.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.