Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />Project: Refuse Pile <br />Location: Foidel Creek Mine <br />Client: Twentymile Coal Co. <br />Project No.: 99-3983 <br />Report No.: 19 <br />Date: 7/8/04 <br />Time: 3.5 <br />Mileage: 44 <br />Engr./Tech: CR <br />Work Pertormed: <br />As requested, we visited the project site on this date and conducted nuclear density test No.'s 278 through 281 on <br />the material that was placed in the refuse pile. <br />Twentymile Coal Company crews placed and compacted processed Waste Coal in Area 2'/a. <br />We obtained a moisture content sample at each test location and a composite sample of the material being tested <br />and delivered it to our laboratory for checkpoint Proctor determination. The composite sample matched Sample <br />Number 8 for this project. <br />Remarks: <br />The material tested generally met the project specifications for compaction. <br />Please refer to the attached sheet for results of today's testing. <br />Verbal Discussions: <br />Dave Wallace of Twentymile Coal Co. was notified of toda~/s test results. <br />