My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP17581
DRMS
>
Back File Migration
>
Report
>
REP17581
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:46:37 PM
Creation date
11/27/2007 2:11:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
Report
Doc Date
3/28/2001
Doc Name
QUARTERLY COAL WASTE BANK INSPECTION REPORT
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII <br />999 <br />QUARTERLY COAL WASTE BANK INSPECTION REPORT <br />CDMR Rules 4.09.1(11) and 4.10.2(2) <br />Mine: Raton Creek <br />Waste Bank MSHA ID. No.: Primary Refuse Disposal Area <br />Inspection Period: First Quarter 2001 <br />Inspection Date: 28-Mar-01 <br />General Description or Reference to Site Plan: <br />Raton Creek Mine is in final reclamation. All required structures have been removed, <br />the area brought to final grade, mulched and seeded. Areas of lesser vegetation <br />density were inter-seeded in 2000. <br />Activity During Inspection: <br />Area was inactive thoughout the quarter. The erosion control contour ditch on the west facing <br />slope has been armoured with crushed rock to minimize erosion. <br />Ground was moist from recent precipitation. Cool season grasses were starting to <br />establish growth. <br />Drainage: (Discussion of springs. seeps, overland and channel Flow, underdrain construction and/ <br />or discharge, integrity of 100-year 24-hour drainage structures, and evidence of positive drainage). <br />No springs or seeps were observed on the refuse side slopes. Positive drainage is established on <br />all areas. Vegetation has been established on reclaimed areas with some minor rilling on more <br />sparsely vegetated areas. Drainage and diversion structures were intact with some minor stoughage <br />noted on the west facing drainage structure above and to the south of the water tank. <br />Underdrain construction has been completed. <br />O~ssNatio"n of Fill Construction: (Description of material, compaction, lift thicknesses, slopes, <br />and construction methods). <br />Structure iias been completed to final grade. No additional material placement is anticipated. <br />,, . <br /> <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.