Laserfiche WebLink
HITEWAI~R BUlllll,lllllllllllll III BLS C~IPORATION <br />~. <br />SAND & GRAVEL PRODUCTS <br />Phone 242-7537 <br />s4o scum lom street, P.O. Bos 17ss <br />GRAND JUNCTION, COLORADO 81502 <br />READY MIXED CONCRETE <br />Phone 242-4843 <br />September 10, 1999 <br />Division of Minerals and Geology <br />Minerals Section <br />1313 Sherman Street Suite 215 <br />Denver, Colorado 80203-2273 <br />Gentlemen: <br />~~~~~v~~ <br />19g9 <br />SAP `' `. &GeO~Y <br />O~~'5~0~~,M\~`a~ <br />O <br />,~v <br />Re: Annual Report, MLRB File H-77-~29,~ .~ ,~~Gq <br />i~Ihitewater Pit 500 - Mesa County <br />Anniversary Date: 09/22/99 <br />Federal Tax ID / <br />This pit HAS NoT been granted a Temporary Cessation and it <br />HAS operated more than 180 days this year. The Financial War- <br />ranty for this operation is $30,576.34, and the permitted area is <br />606.96 ac. ± and the pit is divided into 18 Reclamation Phases. <br />Stages 1 thru 5 cover an alluvial deposit of sand 6 gravel that <br />runs along the river, and Stages A thru H (8) are on a terrace <br />deposit above the river. Stages V thru Z (5) are part of the <br />Plant Site or areas mined before the law and are currently being <br />backfilled as part of the reclamation plan. We are amending this <br />permit and the changes will not affect the mining plan at this <br />time. <br />As required in Rule 6.7 the mine permit sign has been <br />installed at the entrance to the pit and the boundary has been <br />outlined with red toped posts to delineate the affected lands. <br />Please refer to the attached map for location of the areas <br />discussed in this report. We have used an excerpt from the large <br />map from the original application to save space and make it <br />easier to review the annual report. This map does not show the <br />entire permit area, only the area south of the river affected by <br />the operation at this time. <br />We will deal specifically with each of the Annual Report <br />requirements as outlined in Rule 1.15 of the Rules and Regula- <br />tions. <br />(1) Mining continued in Stage 2, & move in to Stage E as ap- <br />proved in our plan. We completed mining on 5.77 acres t in <br />Stage 2; and 2.16 ac. t in Stage D as shown on the Annual <br />Report Map (///). The Plant Site in Stages W, Z and 2 is <br />