Laserfiche WebLink
1 <br /> <br /> <br />fl <br />1 <br />1 <br /> <br /> <br />Banks and Gesso LLC <br />process water to evaporation and product moisture, no discharge of process <br />water is anticipated. <br />The storm-water runoff around the concrete batch plant will be directed toward <br />the lined washout area. When trucks return to the site with left-over concrete, it <br />will be placed on the around by the recycling plant, before the truck is washed <br />out. This concrete will harden before being recycled through the plant. The <br />wash water is recycled through the concrete plant. The sediment from cleaning <br />the wash-out basin is also processed through the recycle plant. <br />The Applicant will store diesel fuel on-site, utilizing double lined storage facilities. <br />A Spill Prevention, Control and Countermeasures Plan will be established and <br />implemented for the site. The maintenance building for trucks and other <br />equipment will have a~ncrete floors, and provide locked storage for cleaning <br />solvents, hydraulic fluids, and other materials. The additives for concrete <br />production will be stoned in similar locked and lined areas at the concrete batch <br />plant. Spillage of these chemicals would flow into the recovery system. <br />5.8 Schedule of Operation <br />' The hours of operation are as follows: <br />' Aggregate Mining and Processing <br />Gam -- 10pm, Monday -Saturday <br />Ready-Mix Concrete Operation <br />' 24 hours per day, Monday -Saturday <br />Maintenance and Repair <br />24 hours per day, 7 days per week <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1 <br />It is anticipated that operations at the site (mining and concrete mixing) will occur <br />approximately 250 days per year. The total life of the project up to the creation of <br />the final reservoir is expected to be 12 to 15 years. <br />5.9 Landscaping, fencing, and Screening <br />The location of areas to be landscaped, screening berms and fences are shown <br />on the Site Plan Map. <br />6.0 Water and Sewer Service <br />The property is within the South Adams Water and Sanitation District and a tap <br />from that district is associated with the property. There are currently two septic <br />systems on the property, one serves the residence and the other serves the <br />scale house. <br />Speer Mining Resource 18 99035 <br />Asphalt Specialties Company, Inc February, 2000 <br />