My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP17538
DRMS
>
Back File Migration
>
Report
>
REP17538
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:46:35 PM
Creation date
11/27/2007 2:10:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983176
IBM Index Class Name
Report
Doc Date
7/24/2000
Doc Name
CONDITIONAL USE PERMIT APPLICATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1 <br /> <br />1 <br /> <br />~g c~o~~~~~o~g o~gor~~o~~ or~c~ <br />denver • grand junction • trinidad <br />July 17, 2000 <br />Mr. Dale Arpin, Traffic Superintendent <br />' Adams Count Public Works <br />4955 East 74 Avenue <br />Commerce City, CO 80022 <br />' RE: Preliminary Plan -Speer Mining Resources <br />Left Tum Lane Improvements on Old Brighton Road <br />RGCE Job No. 305.0002 <br />Dear Mr. Arpin: <br />' As per our phone conversaation last week, please find enclosed herewith one copy of the <br />preliminary plan for the proposed left tum lane and tapers on Old Brighton Road (C.R. 31), for <br />the Speer Mining Resources site access. We are requesting that you review the proposed lane <br />and tapers layout along with the pavement markings, so that we may proceed with the design <br />and development of construction plans for this project. <br />' We are proposing that the new pavement be constructed with 5-inches of asphalt on existing <br />subgrade, and that a 2-inch asphalt overlay be placed over the entire roadway section along the <br />length of the improvements. We would appreciate receiving your written comments regarding <br />this Preliminary Plan within the next week or so. Your expeditious treatment of this matter is <br />' appreciated. <br />If you have any questions, ply=_ase contact me at this office. <br />' Sincerely, <br />' RG CON1S/LILTING ENGINEERS, INC. <br />' Richard V. Beck, P.E. <br />Civil Engineering Manager <br />RVB:mf <br />Enclosures: Preliminary Left Tum Improvement Plan <br />' cc: Tim Sullivan, Asphalt Specialties Company <br />Paul Banks, Banks arld Gesso, LLC <br />' R:'030SOD02\WINWORD\Speer Mining Resources Ltr July 14.doc <br />1331 17th street • suite 710 •denver, Colorado 80202 • (303) 293-8107 <br />' fax (303)293-8106 <br />
The URL can be used to link to this page
Your browser does not support the video tag.