Laserfiche WebLink
January 23, 2004 <br />In 2003 Slope work and some Topsoiling has begun Reclamation has not <br />started on the pit floor, as we still need this room for stockpiles. <br />Topsoil will continue to be stockpiled to the East and North side of <br />the pit. Some resloping and topsoiling should begin in the fall of 2004 if we <br />move forward enough in the pit to open up enough floor space. <br />In 2004 we should mine between'/> to''/z acre still moving to the <br />North. The Pit will be open May to November in 2004. <br />