My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-09-06_REPORT - M1977403HR
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977403
>
2007-09-06_REPORT - M1977403HR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:35:33 AM
Creation date
11/27/2007 2:07:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977403HR
IBM Index Class Name
Report
Doc Date
9/6/2007
Doc Name
Annual Fee/Report/Map
From
Idarado Mining Company
To
DRMS
Permit Index Doc Type
Annual Fee / Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Idarado Mining Company <br />2006/2007 Annual Report <br />Permit Number: M-1977-403-HR <br />Anniversary Date: July 1, 2007 <br />Idarado Mining Company (IMC) is implementing remediation and reclamation activities <br />as per the Consent Decree (D. Colorado Civil Action No. 83-C-2385) between the State <br />of Colorado Department of Public Health and Environment, the State of Colorado Office <br />of Attorney General, and IMC. <br />All field reclamation and remediation activities prescribed and required within the <br />Remedial Action Plan (RAP) as amended to the Consent Decree has been completed and <br />the monitoring of these reclamation and remedial activities is being conducted and will <br />continue to be conducted, at least, until calendar 2011. No amendments to the Consent <br />Decree and RAP were conducted during the 2006/2007 anniversary year (July 1, 2006 - <br />July 1, 2007). <br />Site activities conducted during the anniversary year included: <br />1. RAP monitoring and maintenance (e.g., soil erosion, slope stability, revegetation, <br />diversion structures, etc.) was conducted where monitoring activities determined <br />repairs or maintenance was required. Spring and fall season diversion structure <br />debris removal was conducted at the Red Mountain and Pandora (Telluride) <br />operations. Debris removal and clean out of the High Country channels was <br />conducted during the summer when roadway access allowed entrance to the High <br />Country areas. Periodic water quality monitoring as per the schedule and <br />requirements prescribed in the RAP was conducted. All monitoring and <br />maintenance activities under the RAP were completed in a timely fashion and to <br />the specifications and requirements of the RAP. Water management from the Red <br />Mountain and Pandora mine workings was conducted throughout the reporting <br />period in accordance with the provisions of the RAP. <br />2. Mining and milling operations associated with the Idarado Red Mountain, <br />Pandora, and High Country sites are not and were not operationally active during <br />the permit year. No mining, beneficiation or waste rock disposal operations were <br />conducted during the permit year. <br />3. As discussed in the 2005/2006 annual report work permitted under the 2004 <br />Technical Revision (TR) was completed during the 2005/2006 anniversary year. <br />As contemplated with the Division's Technical Revision, the materials <br />
The URL can be used to link to this page
Your browser does not support the video tag.