Laserfiche WebLink
%' <br />In all cases, no reclamation costs will be incurred outside <br />of those already under bond. Reseeding costs for the <br />depression southeast of Fresh Water Pond No. 1 was included <br />in Table 4.B.1.A of the M and R Plan under revegetation of <br />the 80 acre primary surface disturbance site. Reclamation <br />of the Bear spoil disposal area was included in Table <br />4.8.1.A as well. The retaining wall will remain a permanent <br />fixture on site in order to insure stability of the slope <br />behind the substation. 8ackfilling of the substation pad <br />has already been included as a bonded reclamation cost in <br />Tables 4.8.1.A and 4.8.1.8 of the M and R Plan. <br />If you have any additional questions or need any additional <br />information, please do not hesitate to contact me. <br />--~erely <br />Paige Seville <br />Sr. Permit Coordinator <br />cc: Kirk Nobis, WECC <br />Rocky Bowman, WECC <br />